Exciting day today. Besides finally getting the floor up in the bathroom, we had our building consultant, Larry Jones of Whitecap Builders, come in and look over the place. He pointed us in the right direction with several things, and gave us the ego boost we needed when he agreed with us that the project was not overwhelming.
We ordered windows and doors. 10 new windows and a set of 8' sliders to replace the upstairs bay window. We are replacing the front picture window and accompanying side lights with three 6 over 6 mullioned windows that match those downstairs. We are replacing the side door with a window to make the downstairs bathroom.
We discussed what to do in the basement and decided on plastic sheeting and four inches of pea stone to level out the floor and keep the moisture levels down.
We got rid of the last giant piece of furniture when the walnut head board found temporary digs at the Goodwill today. I thought we were going to have to break the thing up for firewood because it wasn't going down the stairs when the walls were up. Guess we might've waited to get those beds down the stairs!
Thursday, November 19, 2009